Pre-Fumigation Preparation

Failure to properly prepare your property will result in the fumigation crew canceling your tenting and charging a “Show-Up Fee.” Navigate our strict preparation protocols below to ensure absolute compliance with SPCB and gas company mandates.

Preparation Timeline Generator

Input your scheduled tenting date to generate your mandatory countdown checklist.

Preparation Deep-Dives

SPCB Plant & Tree Clearance

Tents cannot touch foliage. Learn the strict 12-inch exterior clearance rule and how to hire verified local arborists to prep your roofline.

Read Clearance Rules →

Pre-Tenting Structural Audits

Protect yourself from liability. Why you must hire an independent home inspector to document your roof and exterior before the crew arrives.

View Audit Protocols →

Rodent Exclusion Post-Vikane

Vikane gas does not repel future rodents. Learn why immediate structural exclusion is required to seal the entry points the termites created.

Read Exclusion Guide →

Nylofume Bagging Regulations

The definitive guide to double-bagging perishables, medications, and pet food to prevent sulfuryl fluoride contamination.

Access Bagging Guide →